CRL was engaged by Downer to deliver refurbishment works at two sewerage treatment plants in Wagga Wagga — Narrung STP and Kooringal STP. The project formed part of Downer’s contractual requirement to return both facilities to Wagga Wagga City Council with a minimum residual service life of 15+ years.
· Crack Injection Works:
o Sealed leaking cracks and joints in tanks and galleries.
o Restored water-tightness and extended service life.
· Concrete Breakout & Repair:
o Removed and replaced deteriorated or cracked concrete in the Clarifier and Aeration Tank.
· Joint Repair & Sealing:
o Addressed joint leaks in the Filter Gallery and CCTs, restoring structural integrity.
· Protective Coatings:
Applied to high-risk areas to provide long-term protection against environmental and chemical exposure.